★★★★★ 4.9 · 30 Google reviews

Dumpster Size Guide: What Size Dumpster Do I Need?

What Size Dumpster Do I Need?

Choosing the right dumpster size is the decision that most affects what your rental costs. Too small and you’ll need a second container; too big and you paid for air. This guide uses our actual containers — real dimensions, real capacities, real prices.

The four sizes at a glance

Size Dimensions (H × W × L) Capacity ≈ Weight included Price
10 yard 4 ft × 8 ft × 11 ft 3–4 pickup truck loads 1 ton $499–$525
15 yard 4.5 ft × 7.5 ft × 12 ft 4–5 pickup truck loads 1 ton $499–$525
20 yard 4 ft × 8 ft × 22 ft, or 5.5 ft × 7.5 ft × 14 ft 6 pickup truck loads 2 tons $599–$625
30 yard 6 ft × 8 ft × 22 ft 9 pickup truck loads 2 tons $599–$625

Every rental includes delivery, pickup, and up to 14 days. Note that not every size is available in every county: Middlesex, Somerset, Monmouth, Morris, and Union counties offer all four sizes; Mercer, Essex, Passaic, Bergen, Hunterdon, Burlington, Warren, Hudson, and Ocean counties offer 10, 20, and 30 yard only.

10 yard dumpster — small projects, heavy loads

Our smallest container, and the right choice more often than people expect.

Best for:

  • Single-room cleanouts (garage, basement, attic)
  • Small bathroom remodels
  • Heavy debris in small amounts — concrete, brick, and similar material (for rentals arranged for concrete)
  • Small roofing jobs and deck removals

Why choose it: It’s the easiest container to place — 11 feet long fits most driveways — and for heavy material it’s the safest choice, because weight limits are reached long before a big container fills up. If your project is heavy rather than bulky, start here.

15 yard dumpster — the in-between size

For projects that have outgrown a 10 yard but don’t justify a 20.

Best for:

  • Medium cleanouts (multiple rooms, small estates)
  • Kitchen remodels
  • Flooring removal for a house
  • Medium landscaping and renovation debris

Why choose it: Same driveway-friendly footprint class as the 10 yard, with about 50% more room. Available in Middlesex, Somerset, Monmouth, Morris, and Union counties.

20 yard dumpster — our most popular size

The workhorse. If you’re torn between two sizes, it’s usually this one.

Best for:

  • Full kitchen and multi-room renovations
  • Roof replacements (full tear-offs)
  • Large garage and estate cleanouts
  • Construction and demolition debris
  • Carpet and flooring removal for larger homes

Why choose it: It holds about 6 pickup truck loads and includes 2 tons of weight, which covers the great majority of residential projects without overage. We stock it in two shapes — a long, low 22-foot version and a shorter, taller 14-foot version — so it can work in both open driveways and tighter spots. Ask which fits your property when you call.

30 yard dumpster — major projects

For when the debris is measured in rooms, not loads.

Best for:

  • Whole-home cleanouts and foreclosure cleanouts
  • Major additions and large renovations
  • Commercial cleanouts and construction
  • Demolition of garages and large structures

Why choose it: At 6 feet high and 22 feet long it takes about 9 pickup truck loads of bulky debris. It’s for volume, not weight — heavy material like concrete belongs in a smaller container.

How to decide: three questions

1. Is your debris heavy or bulky? Heavy (concrete, brick, shingles, wet material) → think weight first and size down. Bulky (furniture, household junk, lumber) → think volume and size up.

2. How many pickup loads is it, honestly? Count what you’d haul to the dump yourself. 3–4 loads = 10 yard, 6 loads = 20 yard, 9 loads = 30 yard. Most people underestimate by about a third — if you’re between sizes, the larger one is almost always cheaper than a second rental.

3. How much weight is in it? Every size includes a weight allowance (1 ton on 10/15 yard, 2 tons on 20/30 yard); overages are charged per ton at your county’s rate. Our dumpster weight calculator estimates common loads — roofing, concrete, household debris — before you book.

Will it fit on my property?

Measure the spot, not just the container. Leave the container’s full length plus room for the truck to maneuver, and if you’ll be loading through the container’s door, allow almost 8 extra feet beyond the container’s length for the door to swing open and be walked through.

Protecting your driveway? Roll-off containers are heavy and not padded underneath, so if you want to protect your driveway, place 4×8 plywood sheets — or four 3-foot 2×6 planks — down before delivery. We don’t supply the boards.

If the container has to sit on the street instead of your property, a permit is required first — that applies everywhere in New Jersey. And note that a few towns have started requiring a permit for driveway placement as well, so it’s worth confirming with your municipality either way — see our NJ dumpster permit guide.

Still not sure?

That’s normal — sizing is the part everyone guesses at. Call 732.322.5327 (7 AM–9 PM, every day), describe the project, and we’ll tell you the size we’d rent for it. If it’s a 10 yard job, we’ll say so. For full pricing by size and county, see how much a dumpster rental costs in New Jersey.